Workflow
西高院第二大股东减持套现1亿元 2023上市募资11.2亿

Core Viewpoint - The announcement details the share reduction plan of a major shareholder, Beijing Fengying Anchuan Enterprise Management Consulting Center, and the results of the share reduction activities conducted within the specified timeframe [1][2]. Group 1: Share Reduction Plan - The shareholder plans to reduce up to 9,497,383 shares, representing no more than 3% of the total share capital, from April 17, 2025, to July 16, 2025 [1]. - The reduction will occur through two methods: a maximum of 3,165,794 shares via centralized bidding (up to 1% of total shares) and up to 6,331,589 shares through block trading (up to 2% of total shares) [1]. Group 2: Share Reduction Results - As of the announcement date, the shareholder has already reduced 6,595,666 shares, which is 2.08% of the total share capital, between May 6, 2025, and June 27, 2025 [1]. - The reduction included 266,666 shares sold through centralized bidding and 6,329,000 shares through block trading, with a total transaction value of 102,398,528.7 yuan at prices ranging from 15.26 to 16.95 yuan per share [1]. Group 3: Shareholder Information - Before the reduction, the shareholder held 46,893,333 shares, accounting for 14.81% of the total share capital, and after the reduction, the holding decreased to 40,297,667 shares, or 12.73% [2]. - The shareholder is the second-largest shareholder of the company and is not classified as a controlling shareholder or actual controller [2]. Group 4: Company IPO and Fundraising - The company was listed on the Sci-Tech Innovation Board on June 19, 2023, with a total of 79,144,867 shares issued at an initial price of 14.16 yuan per share, raising a total of 112,069.13 million yuan [2]. - The net fundraising amount after deducting issuance costs was 105,978.30 million yuan, exceeding the original plan by 14,978.30 million yuan [2]. Group 5: Use of Proceeds - The company plans to use the raised funds for various projects, including key technology research for green electrical equipment and the construction of a public service platform for power distribution equipment [3].