Workflow
山西电网用电负荷连创度夏新高
Zhong Guo Neng Yuan Wang·2025-07-18 15:31

Core Insights - Shanxi Province is experiencing a significant increase in electricity load due to prolonged high temperatures, with the maximum load reaching 41.25 million kilowatts on July 15, marking a new summer peak and a year-on-year increase of 5.91% [1] - The rise in electricity demand is attributed to the surge in air conditioning usage and the steady growth in industrial production across the province [1] - The State Grid Shanxi Electric Power Company is implementing measures to ensure safety, supply, and livelihood during this peak demand period, including precise load forecasting and strict management of power generation units [1] Group 1 - The maximum electricity load in Shanxi reached 41.25 million kilowatts, a new summer high [1] - Six cities in Shanxi set new summer peak records for their power grids [1] - The company has launched 15 key projects to enhance power supply capacity by approximately 2.8 million kilowatts [1] Group 2 - The company is actively supporting national electricity supply during the summer peak, with the maximum external power delivery reaching 25.49 million kilowatts [2] - The ±800 kV Yanmen Pass-Huai'an UHVDC project has successfully delivered full power to Jiangsu six times [2]