Group 1 - The company has initiated a level III response to typhoon "Weipa" as of July 19, 0:00, and has formed a support team of 350 personnel for emergency preparedness [2] - A total of 118 emergency power vehicles and 53 generators have been arranged to ensure safety during the typhoon [2] - The company has adjusted the power grid operation mode to maintain full protection and stability of the main network and 500 kV double-circuit lines [2][3] Group 2 - The company is coordinating with 19 power supply bureaus to enhance inspections and identify potential flooding hazards in 1,339 public distribution rooms [2] - Emergency repair teams have been established, with the Sanya Power Supply Bureau forming 12 teams totaling 594 personnel on standby [3] - The company has deployed 23 emergency power vehicles and 60 small generators to ensure power supply stability during the typhoon [3]
海南电网全力做好防风防汛各项准备工作
Hai Nan Ri Bao·2025-07-20 01:24