Workflow
页岩油压裂返排液处理试验成果喜人
Qi Lu Wan Bao·2025-07-20 21:17

Core Insights - The successful production trial of shale oil fracturing flowback fluid treatment addresses high transportation costs and impacts on the gathering system, marking a significant advancement in shale oil development [1][2] - The trial involved collaboration among multiple departments, enhancing efficiency and overcoming various technical and management challenges [2] Group 1: Treatment Process and Results - The treatment process has effectively reduced the need for transporting flowback fluid, with over 15,000 cubic meters of fluid processed [1] - The trial demonstrated the feasibility of the treatment technology, achieving stable and economically efficient processing of flowback fluid [1] - The water quality indicators from the treatment met relevant standards, indicating good compatibility with production water [1] Group 2: Future Plans and Enhancements - The oil field will continue to analyze the properties of flowback fluid and optimize process connections to further reduce treatment costs [2] - There will be a focus on implementing safety risk control measures and upgrading technical equipment to support large-scale shale oil development [2]