Core Viewpoint - Q2 Metals Corp. has announced an inaugural Exploration Target for the Cisco Lithium Project, estimating potential mineralization between 215 to 329 million tonnes at a grade of 1.0 to 1.38% Li2O, marking a significant milestone for the company in the lithium sector [2][3][10]. Exploration Target Details - The estimated range of potential mineralization is from 215 to 329 million tonnes with a grade ranging from 1.0 to 1.38% Li2O, based on the first 40 drill holes totaling 16,167.8 meters [3][6]. - The Exploration Target is conceptual and does not constitute a mineral resource or reserve, as further exploration is needed to define a Mineral Resource [4][6]. - The current Exploration Target is limited to the defined Mineralized Zone, with potential for further increases in lithium endowment outside this area [7][18]. Geological and Drilling Insights - The Exploration Target was developed by BBA Inc., an independent geological consulting firm, based on geological evidence and drilling data [6][13]. - The 2025 Summer Program is ongoing, with additional drilling expected to provide further assay results into Q3 2025, aiming for a maiden resource estimate [6][22]. - The mineralization remains open at depth and along strike, indicating potential for significant expansion [6][10]. Project Location and Infrastructure - The Cisco Project is located within the greater Nemaska traditional territory of the Eeyou Istchee, James Bay region of Quebec, Canada, and is strategically positioned near the Billy Diamond Highway and rail access in Matagami [21][10]. - The project encompasses 801 claims over 41,253 hectares, highlighting its district-scale potential [21]. Company Statements and Future Plans - Q2 Metals' President and CEO emphasized the significance of the Exploration Target, positioning Cisco as a globally important hard rock lithium discovery [10]. - The company plans to continue advancing the Cisco Project, focusing on creating shareholder value through ongoing exploration and development efforts [10].
Q2 Metals Defines Initial Exploration Target of 215 to 329 Million Tonnes at the Cisco Lithium Project in James Bay, Quebec, Canada