Core Viewpoint - Nevada King Gold Corp. has filed a National Instrument 43-101 technical report detailing the gold and silver mineral resources for the Atlanta Project in Lincoln County, Nevada, which is now available on SEDAR+ and the company's website [1][3]. Group 1: Technical Report Details - The technical report titled "Technical Report and Estimate of Gold and Silver Mineral Resources for the Atlanta Project, Lincoln County, Nevada, USA" was prepared by RESPEC and has an effective date of September 6, 2024, with a report date of July 18, 2025 [1][3]. - The Atlanta Gold Mine project hosts an NI 43-101 compliant pit-constrained oxide resource of 1,020,000 ounces of gold in the measured and indicated category, comprising 27.7 million tonnes at a grade of 1.14 g/t [3][4]. - An inferred resource of 98,500 ounces of gold is also reported, consisting of 3.6 million tonnes at a grade of 0.84 g/t [3][4]. Group 2: Mineral Resource Estimates - The measured resources at the Atlanta Mine total 3,430,100 tonnes with an average grade of 1.55 g/t, equating to 170,800 ounces of gold and 1,870,200 ounces of silver [4]. - The indicated resources amount to 24,280,200 tonnes at an average grade of 1.09 g/t, totaling 848,800 ounces of gold and 6,817,200 ounces of silver [4]. - The combined measured and indicated resources (M&I) are 27,710,300 tonnes at an average grade of 1.14 g/t, resulting in 1,019,600 ounces of gold and 8,687,400 ounces of silver [4]. - The inferred resources consist of 3,638,400 tonnes at an average grade of 0.84 g/t, yielding 98,500 ounces of gold and 299,500 ounces of silver [4].
NEVADA KING FILES TECHNICAL REPORT FOR THE MINERAL RESOURCE ESTIMATE AT ATLANTA INCLUDING OVER 1MOZ OF M&I
Prnewswireยท2025-07-21 10:30