Core Viewpoint - China Datang Group's Huizhou Boluo gas-fired cogeneration project has successfully completed its full-load trial operation, marking the full commissioning of a 2×460 MW gas turbine project and surpassing a total installed capacity of 10 million kW in Guangdong province [1] Group 1: Project Details - The project represents a key initiative under Guangdong's "14th Five-Year Plan" with a total investment of 2.7 billion yuan [1] - Construction of the project commenced on September 28, 2023, and it is designed to align with China's dual carbon goals [1] Group 2: Environmental Impact - The project is expected to save 45 mu of land compared to similar projects and will be powered entirely by clean energy [1] - It is projected to reduce carbon dioxide emissions by approximately 1.7351 million tons annually and decrease standard coal consumption by 340,000 tons [1] - The use of high-efficiency low-nitrogen burners will result in a nitrogen oxide emission concentration of only 15 mg/m³ during normal operation [1] Group 3: Strategic Importance - The project plays a significant role in optimizing the energy structure of the Guangdong-Hong Kong-Macao Greater Bay Area and contributes to the establishment of a green and clean energy system [1] - It supports the achievement of carbon peak and carbon neutrality goals in the region [1]
中国大唐在粤在役机组容量突破千万千瓦大关