
Core Viewpoint - Thor Explorations Ltd has announced initial drilling results from its Guitry Gold Project in Côte d'Ivoire, indicating promising gold mineralization and the potential for further resource development [1][4][5]. Drilling Program Overview - The company completed a 3,000 metre reverse circulation drilling program during May and June 2025, aimed at understanding the geometry and geological controls on gold mineralization [2][14]. - Initial assay results have been received, confirming the new interpretation of mineralized lodes and intersecting previously untested deeper bedrock mineralization [5][19]. Significant Assay Results - Notable drill results include: - Drillhole GURC25-208: 14m at 2.59 g/t Au from surface - Drillhole GURC25-214: 10m at 10.36 g/t Au from 57m - Drillhole GURC25-219: 3m at 14.50 g/t Au from 82m - Drillhole GURC25-228: 5m at 12.65 g/t Au from 69m [8][19][29]. Project Background - The Guitry Project was acquired from Endeavour Mining for US$100,000 and a 2% Net Smelter Royalty, covering 295 square kilometres in a region known for significant gold deposits [9][28]. - The project is located within the Tehini Greenstone Belt, which hosts large gold deposits in Burkina Faso [9]. Future Exploration Plans - Further exploration at the Krakouadiokro Prospect will include infill and step-out drilling, as well as drilling on numerous geochemical anomalies at both the Krakouadiokro and Gbaloukro Prospects [3][26]. - The company plans to continue drilling after the rainy season and initiate a maiden drilling program on the Marahui Project [6][26].