Core Viewpoint - China Electric Power Construction (601669) announced that its subsidiaries have won a bid for the Sun Gou Pumped Storage Power Station EPC general contracting project, with a total bid amount of approximately 5.752 billion RMB [1] Group 1: Project Details - The winning consortium consists of China Electric Power Construction Group Beijing Survey and Design Research Institute Co., Ltd., China Water Resources and Hydropower Fifth Engineering Bureau Co., Ltd., China Water Resources and Hydropower Sixth Engineering Bureau Co., Ltd., and China Water Resources and Hydropower Twelfth Engineering Bureau Co., Ltd. [1] - The project is located in Urat Houqi, Bayannur City, Inner Mongolia [1] - The construction preparation period for the project is 24 months, and the total construction period is 69 months [1]
中国电建:中标太阳沟抽水蓄能电站EPC总承包项目,中标总金额约为57.52亿元人民币