Workflow
天水电网迎战高温“烤”验 全力守护万家清凉
Zhong Guo Neng Yuan Wang·2025-07-23 08:57

Core Viewpoint - The company is actively enhancing its power supply capabilities in response to extreme heat conditions, ensuring reliable electricity supply and safety for critical facilities and the general public [1][3][4]. Group 1: Power Load and Consumption - On July 19, the maximum temperature in Tianshui exceeded 36°C, leading to a significant increase in electricity load, with the daily maximum load reaching 1.5267 million kilowatts, a year-on-year increase of 13.03% [1]. - The daily maximum electricity consumption was 28.5975 million kilowatt-hours, reflecting a year-on-year growth of 7.85% [1]. Group 2: Operational Measures - The company is closely monitoring weather changes and load trends, enhancing load forecasting, and adjusting grid operations to alleviate equipment overload [3]. - Special inspections, infrared temperature checks, and live-line testing are being conducted to ensure the safe operation of equipment, focusing on weak points in the grid and heavily loaded devices [3][4]. Group 3: Technology and Innovation - The company is integrating advanced technologies such as distribution automation systems and intelligent inspection robots to improve fault detection and response efficiency [4]. - Data analysis is being utilized to identify equipment issues, transitioning from traditional manual operations to data-driven management [4]. Group 4: Community Engagement and Support - The company has launched a "High-Temperature Power Protection Green Channel" to provide dedicated power supply services to key locations such as nursing homes and hospitals, ensuring uninterrupted service [4]. - Staff are conducting summer electricity inspections and safety awareness campaigns in local communities to enhance public awareness of electricity safety [3].