Core Points - Inner Mongolia is facing severe flooding due to continuous heavy rainfall, prompting local authorities to implement emergency measures to protect lives and property [1][2][3] - Various departments, including transportation and telecommunications, are coordinating efforts to manage the crisis and ensure public safety [2][4][5] Group 1: Emergency Response Measures - The flood control command in Hohhot upgraded its emergency response level from Level 3 to Level 2, anticipating rainfall of 45 to 150 millimeters, with localized areas exceeding 180 millimeters [1] - Hohhot's water supply and drainage service center established a 24-hour information sharing mechanism with other departments to monitor rainfall trends [1] - Over 520 flood control personnel and more than 100 vehicles from Hohhot Chunhua Water Development Group are actively engaged in flood prevention efforts [2] Group 2: Impact of Rainfall - From July 23 to 25, rainfall in Ulanqab affected 2,763 people, with 623 individuals relocated and direct economic losses amounting to 5.7953 million yuan [3] - In Ordos, the maximum rainfall recorded was 227 millimeters, with no reported emergencies as water levels in reservoirs and rivers remained normal [4] - Alxa League experienced rainfall with totals reaching 82.7 millimeters, prompting transportation departments to enhance monitoring and response efforts [6] Group 3: Infrastructure and Communication - Telecommunications companies in Hohhot activated emergency plans to ensure communication services remain operational during the flooding [2] - The Baotou city police reported an average of 80 to 100 flood-related incidents daily, utilizing a video monitoring system for real-time dispatching of rescue forces [2] - Baotou city has mobilized 1.2 billion yuan for emergency rescue and disaster relief, deploying over 26,000 machines for drainage and road repairs [5]
内蒙古各地积极作为打好防汛主动仗
Nei Meng Gu Ri Bao·2025-07-25 14:28