Core Points - The successful completion of the Tianzhushan No. 1 Tunnel marks a significant milestone in the construction of the Xi'an to Shiyan High-Speed Railway, with all tunnels in the Shaanxi section now fully connected [1][2] - The tunnel, measuring 14.7 kilometers in length and reaching a maximum depth of 690 meters, presents complex geological challenges, including fault zones and water inflow, making it a critical and high-risk project [2] - The construction of the Xi'an to Shiyan High-Speed Railway is progressing rapidly, with 15.5 tunnels completed, 99% of the roadbed and bridge works designed completed, and 35% of the ballastless track construction finished [2] Industry Impact - Once operational, the railway will reduce travel time from Xi'an to Shiyan to under one hour and from Xi'an to Wuhan to approximately 2.5 hours, enhancing connectivity between the Guanzhong urban agglomeration and the Yangtze River middle reaches [3] - The project is expected to significantly contribute to the economic and social development of the Qinba Mountain area and support rural revitalization along the railway line [3]
西十高铁陕西段全线隧道贯通
Xin Hua She·2025-07-26 09:04