Core Points - The G2001 Jinan Ring Expressway from Xinglong Hub to Shizhong Interchange will undergo construction from August 5, 2025, to September 30, 2026, to enhance safety and prevent traffic accidents [1] - The construction will involve the closure of the main line left lane (west to east direction) from Xinglong Hub to Shizhong Interchange [2] - Additional closures will affect the exit ramp from Changqing to Jinan South Toll Station and the entrance ramp from Jinan South Toll Station to Laiwu [3] - The Shizhong Interchange will also see the closure of the entrance ramp from Shizhong Toll Station to Laiwu [4] Traffic Management Measures - A speed limit of 80 km/h will be enforced on the G2001 Jinan Ring Expressway from Xinglong Hub to Yinjialin Hub, with restrictions on medium and heavy trucks and hazardous materials vehicles [5] - Further traffic control measures may be announced as construction progresses [5] Detour Routes - Short-distance traffic will be diverted via several routes, including: - Route 1: Jingtai Expressway → G104 National Road → South Second Ring Elevated Road → Jinan City [6] - Route 2: Jingtai Expressway → Jinan West Toll Station → Jinan City [6] - Route 3: Jingtai Expressway → International Medical Center Toll Station → Jinan City [6] - Long-distance transit traffic will also have designated routes from surrounding areas, including: - Route 1: Jingtai Expressway → Jiguang Expressway [8] - Route 2: Jingtai Expressway → Qingyin Expressway [8] - Route 3: Jingtai Expressway → Qinglan Expressway → Jinghu Expressway [8]
绕行路线请查收,济南绕城高速兴隆枢纽至市中互通段封闭施工
Qi Lu Wan Bao·2025-07-28 08:15