ST盛屯(600711.SH):拟签订项目投资合作协议
Group 1 - The core point of the article is that ST Shengtun (600711.SH) is entering into an agreement with Green Energy International Limited to optimize its power structure and reduce operational costs through a solar energy storage project [1] - The agreement involves Brother Mining SASU (BMS), a subsidiary of ST Shengtun, which will collaborate with Green Energy International for the design, construction, and investment of the solar energy storage station [1] - Upon completion of the solar energy storage station, BMS will consume 100% of the generated electricity at a preferential price over a 10-year cooperation period, with an estimated total payment of approximately $48.06 million [1]