Core Points - The trial operation of the Chang-Jiu High-speed Railway segment from Nanchang East to Hejia has commenced, marking a significant step towards its official opening [1][3] - The trial run is crucial for testing train operation parameters, simulating faults, and conducting emergency rescue drills, providing a scientific basis for the railway's official launch [1][3] Summary by Sections Trial Operation Details - The trial segment is 21 kilometers long, connecting Nanchang East Station to Hejia and linking with the existing Beijing-Hong Kong High-speed Railway [3] - The operation will alleviate transportation pressure at the Nanchang railway hub, reducing train travel time by approximately 7 minutes [3] Connectivity and Impact - The Chang-Jiu High-speed Railway is part of the national "Eight Vertical and Eight Horizontal" high-speed rail network, specifically the Beijing-Hong Kong corridor [4] - Once fully operational, it will enhance connectivity among urban clusters in the Yangtze River middle reaches and surrounding areas, supporting regional economic development [4]
昌九高铁南昌东至何家线路所段开始试运行
Zhong Guo Xin Wen Wang·2025-07-30 22:34