Workflow
全省从严从细应对台风“竹节草”严防风吹“草”动 筑牢安全屏障
Xin Hua Ri Bao·2025-07-30 23:11

Core Points - Jiangsu province is facing significant rainfall and potential flooding due to Typhoon "Zhu Jie Cao" starting from July 29, prompting strict flood prevention measures and emergency responses across the region [1][2][3] Emergency Response - Jiangsu has maintained a Level IV emergency response for flood and typhoon prevention, with various cities initiating similar responses [2][3] - As of the latest reports, over 10,902 vessels and 29,245 individuals have returned to port for safety, with significant infrastructure checks and evacuations conducted [2][3] Weather Impact - Rainfall has been recorded in the southeastern region, with some areas experiencing over 100.0 mm of precipitation [2] - Forecasts predict continued heavy rainfall from July 31 to August 1, with water levels in lakes and rivers expected to rise [2] Transportation and Infrastructure - The transportation sector has implemented strong preemptive measures, including halting operations for numerous ferry services and ensuring safety protocols are in place for construction sites [5][9] - The Jiangsu Maritime Bureau has suspended all vessel operations on the Yangtze River to ensure safety during the typhoon [4][5] Geological and Environmental Monitoring - The Jiangsu Natural Resources Department has initiated a Level IV response for geological disaster prevention, with teams deployed to inspect potential hazards [7][8] - A total of 201 geological hazard points have been inspected, with ongoing monitoring and risk assessments being conducted [7] Utility and Service Management - The Jiangsu Power Company has activated emergency protocols, deploying over 12,160 personnel for power supply maintenance and ensuring communication with key customers [10][11] - The province's construction and urban management departments are actively identifying and mitigating risks in flood-prone areas and ensuring the safety of municipal infrastructure [9][10] Flood Control Measures - Suzhou has managed to drain approximately 1.24 billion cubic meters of water, equivalent to the capacity of 9.5 Jinji Lake, to prepare for further rainfall [12] - In Nantong, significant preemptive measures have been taken, including the evacuation of fishing vessels and the suspension of operations at various ports and construction sites [13][14]