Workflow
国网浙江电力全面迎战台风“竹节草”
Zhong Guo Neng Yuan Wang·2025-07-31 00:58

Core Viewpoint - The article discusses the response and preparedness of State Grid Zhejiang Electric Power Company in dealing with Typhoon "Zhu Jie Cao," which made landfall in Zhejiang Province, emphasizing their proactive measures to ensure power supply stability and safety during the storm [1][2]. Group 1: Emergency Response Measures - State Grid Zhejiang Electric Power initiated a level IV emergency response on July 28 and upgraded it to level III on July 29 in anticipation of the typhoon [1]. - The company conducted comprehensive inspections using "human patrols + drones" and a panoramic monitoring platform, identifying and rectifying 949 hazards, clearing 312 tree obstructions, and addressing 174 floating debris issues around substations [1]. - A total of 273 power generation vehicles and 898 generators were deployed to enhance power supply capabilities, with 47 isolated areas receiving support [1]. Group 2: Weather Monitoring and Forecasting - The Zhejiang Electric Meteorological Center activated a wartime mechanism, utilizing an AI typhoon warning module to continuously assess the impact of the typhoon on power grid equipment [2]. - More than 10 predictive warning reports and 40 warning messages were issued, focusing on potential secondary disasters such as flooding and landslides in regions like Ningbo, Taizhou, and Zhoushan [2]. Group 3: Emergency Preparedness and Coordination - A frontline supervisory team was established in Ningbo and Zhoushan, with a coordinated emergency command system involving provincial, municipal, and county levels [2]. - Over 1,300 emergency repair teams and more than 18,000 personnel were placed on standby, ensuring a rapid response to any power outages or emergencies [2]. - The company emphasized safety and efficient fault detection, utilizing monitoring devices to accurately locate faults and restore power quickly in non-fault areas [2].