Workflow
兴安盟筑牢防汛减灾坚固防线
Nei Meng Gu Ri Bao·2025-07-31 02:40

Group 1 - The core viewpoint of the news highlights the severe rainfall and its impact on the region, with an average rainfall of 41.2 mm recorded in the Xingan League, leading to localized flooding and road blockages [1][2] - The Xingan League's flood control and drought relief command office issued multiple warnings, including three periods of orange and red rainstorm alerts, and conducted joint risk assessments for mountain floods and geological disasters [2] - Emergency measures were implemented, including the pre-release of water from small and medium-sized reservoirs, and the organization of inspection teams to identify disaster risks, with a total of 36 potential geological disaster points checked [2] Group 2 - The transportation department conducted extensive monitoring, covering 4,550 kilometers, and addressed three flooded road sections while preparing emergency materials such as 230 tons of sand and gravel [2] - The construction department mobilized 80 personnel across three emergency response teams and deployed four pump sets to manage flooding [2] - Agricultural departments established four working groups with 20 personnel to provide technical guidance in response to the flooding situation [2]