Core Viewpoint - The company successfully conducted an emergency drill for a large-scale power outage event in Liaocheng, aimed at enhancing its emergency response capabilities during extreme weather conditions [1][4]. Group 1: Emergency Drill Overview - The drill was organized by the Liaocheng Development and Reform Commission and involved a "desktop + practical" approach to simulate the impact of severe weather, including 12-level strong winds and heavy rainfall, leading to power outages and urban flooding [2][4]. - The exercise was divided into three phases: monitoring and early warning, emergency response, and conclusion of the response, with five specific on-site handling scenarios [2]. Group 2: Key Scenarios and Responses - In the "Emergency Power Supply for Liaocheng People's Hospital" scenario, the company quickly dispatched a power generation vehicle to support the hospital, ensuring its electricity needs were met [2]. - The "Flood Prevention at Low-lying Substations" scenario demonstrated the rapid initiation of emergency responses, including coordination with traffic police to clear emergency routes [2]. - The drill showcased the company's ability to quickly remove foreign objects from important transmission lines using smart equipment in the "Safety Hazard Management of Key Transmission Lines to Beijing" scenario [2]. Group 3: Coordination and Experience Gained - The participating units demonstrated high standards of coordination between government and enterprises, showcasing rapid response and efficient rescue capabilities [4]. - The drill provided valuable experience for the company to effectively respond to various sudden adverse weather conditions during the peak summer period [4].
公司圆满举办2025年聊城市大面积停电事件应急演练
Zhong Guo Neng Yuan Wang·2025-07-31 11:26