Core Insights - Shimmick Corporation has been selected as the preferred bidder for four new contracts totaling approximately $156 million, with $47 million allocated for electrical work, reflecting the growing demand for integrated delivery solutions in infrastructure [1][2] Project Summaries - River Trunk Realignment - River Pump Station: A $116 million project in Modesto, CA, aimed at upgrading wastewater infrastructure by rerouting sanitary sewer flows and constructing a 40 million gallon per day pump station [3] - OC San J-98 Power Distribution System Improvements: A $24 million project in Huntington Beach, CA, focused on modernizing electrical distribution systems at two wastewater treatment plants to enhance operational safety and reliability [4] - RD1001 Auxiliary Pump Station: An $8 million project in Nicolaus, CA, involving the construction of a dual-level steel-frame pump station with vertical turbine pumps and associated infrastructure [5] - Perris Valley RWRF Aeration Basin Rehabilitation and Diffusers Replacement: An $8 million project in Perris, CA, aimed at rehabilitating aeration basins and upgrading control systems at the water reclamation facility [6] Company Overview - Shimmick Corporation is a leader in delivering turnkey infrastructure solutions across water, energy, climate resiliency, and sustainable transportation, integrating technical excellence with collaborative project delivery methods [7]
Shimmick Preferred Bidder on $156 Million in New Infrastructure Contracts Across California