Workflow
完成全线首联现浇箱梁施工 高铁苏州北站快速联络道项目进展顺利
Su Zhou Ri Bao·2025-07-31 22:38

Core Viewpoint - The successful completion of the first cast-in-place box girder construction for the Suzhou North Station rapid connection road marks the beginning of the bridge superstructure construction for the entire project, which is crucial for enhancing the connectivity of the Suzhou North Station hub [1][2] Group 1: Project Overview - The Suzhou North Station rapid connection road project is located in Xiangcheng District, connecting the station building with the urban road network, serving as an important infrastructure for external and internal connections of the Suzhou North Station comprehensive hub [1] - The project spans from the west at the West Ring North Extension (S228) to the east at Jujin Road, south to Nantian Cheng Road, and north to Xigong Tian Road [1] Group 2: Construction Details - The first cast-in-place box girder, located at the tenth ramp, has a single box with two chambers, a span combination of 2×27 meters, a beam height of 2 meters, and a bridge deck width of 12.7 meters, utilizing 556 cubic meters of C50 concrete [1] - Currently, the project has completed 59% of the pile foundation, 28% of the cap, and 14% of the pier column, with a cumulative investment of approximately 1.01 billion yuan [1] Group 3: Project Impact - The completion of the rapid connection road will facilitate the integration of urban expressways and highways, creating a rapid distribution system that combines external, internal, and regional networks, enabling seamless transfers between various transportation modes [2] - This project aims to enhance the regional radiation capacity of the Suzhou North Station hub, reduce passenger waiting and travel costs, improve the operational efficiency of the transportation hub, alleviate surrounding traffic pressure, optimize the regional traffic environment, and elevate urban transportation quality [2]