Core Viewpoint - The development of the renewable energy industry in Chahar Right Banner, Inner Mongolia, is significantly contributing to the region's high-quality economic and social development through the utilization of abundant wind and solar resources [1][2]. Group 1: Renewable Energy Development - Chahar Right Banner has a high-quality accumulation of wind and solar resources, with annual effective wind hours of approximately 7,300 and solar radiation totaling 1,614 kWh/m² [1]. - The region has established 11 wind farms and 6 centralized photovoltaic power stations, with a total installed capacity expected to reach 1.914 million kW by the end of 2024, generating an annual electricity output of 4.28 billion kWh [1]. - New projects with a capacity of 1.27 million kW are under construction, aiming to surpass a total installed capacity of 3 million kW by the end of the year [1]. Group 2: Key Projects and Investments - The Chahar Right Banner's coal-fired power transformation project, with a total investment of 3.95 billion yuan and an installed capacity of 960,000 kW, is a key initiative for the region's "14th Five-Year Plan" for renewable energy [2]. - The project is expected to generate an annual grid electricity output of 2.3 billion kWh upon completion [2]. - The establishment of a wind power manufacturing base by TaiZhong Group in the region has filled a gap in the local renewable energy equipment manufacturing sector, with an annual production capacity of 600 units of megawatt-level wind turbines [2]. Group 3: Strategic Goals - The local government aims to create a circular industrial chain that integrates clean energy production, equipment manufacturing, and green electricity transmission, focusing on developing a new energy industry characterized by green, high-end, large-scale, and intelligent features [3].
察右中旗绿色动能强劲
Jing Ji Ri Bao·2025-08-01 21:37