Workflow
包银高铁包惠段进入联调联试阶段
Zhong Guo Xin Wen Wang·2025-08-02 09:58

Core Viewpoint - The testing and commissioning of the Baotou to Yinchuan high-speed railway segment has officially begun, laying a solid foundation for its timely opening [1] Group 1: Project Overview - The Baotou to Yinchuan high-speed railway segment (referred to as Baoyin High-speed Railway Baohui Section) is a crucial part of China's "Eight Vertical and Eight Horizontal" high-speed railway network, specifically the Beijing-Lanzhou corridor [1] - The railway starts from Baotou Station in Inner Mongolia, passing through cities such as Bayannur, Ordos, and Wuhai, and ends at Huinong South Station in Shizuishan, Ningxia Hui Autonomous Region [1] - The total length of the line is approximately 420 kilometers, with about 402 kilometers in Inner Mongolia and 18 kilometers in Ningxia [1] Group 2: Technical and Operational Details - During the joint debugging and testing phase, the railway department will conduct comprehensive tests on the high-speed railway line and train control systems at different speed levels to ensure all performance aspects are satisfactory [1] - The design speed of the railway is 250 kilometers per hour [1] Group 3: Impact on Travel Time - The Baoyin High-speed Railway Baohui Section is expected to be operational within the year, which will allow for the full connectivity of the Beijing-Lanzhou corridor [1] - The travel time from Baotou to Yinchuan will be reduced from a maximum of 6 hours to under 3 hours [1]