Core Viewpoint - The company successfully completed its power rescue tasks during the "Blue Flame Riding Waves 2025" flood rescue drill, highlighting its preparedness and response capabilities in extreme weather conditions [1][12]. Group 1: Emergency Preparedness - The company has implemented a "wake-up and response" mechanism that ensures timely communication of weather warnings, achieving 100% coverage in alerting frontline teams [3]. - A comprehensive inventory of 10.11 million items of emergency repair materials has been established, including 103 lightweight repair poles and 341.5 kilometers of wire, ensuring adequate resources for emergency repairs [4][5]. - The company has organized specialized teams and equipment, including 53 repair teams and 414 personnel, ready to transition from regular operations to emergency repairs within 12 hours [7][9]. Group 2: Safety and Control Measures - Safety management is emphasized, with strict adherence to operational protocols to prevent overloading during repair work [9][10]. - The company has conducted multiple safety drills to reinforce the importance of safety measures and ensure all personnel are familiar with operational procedures [10][12]. - Infrared temperature monitoring of 115 substations has been conducted, identifying and addressing nine instances of abnormal temperatures to mitigate overheating risks [12]. Group 3: Commitment to Service - The company is dedicated to maintaining power supply reliability during extreme weather, positioning itself as a key player in safeguarding local electricity safety [12]. - The proactive approach and rigorous standards set by the company aim to build a robust defense against flooding, ensuring continuous support for local economic and social development [12].
国网陇南供电公司:筑牢防汛保电铜墙铁壁 积极迎战新一轮强降雨
Zhong Guo Neng Yuan Wang·2025-08-04 09:54