Workflow
重庆高温天气持续 电网负荷创历史新高
Zhong Guo Xin Wen Wang·2025-08-04 15:44

Core Insights - The Chongqing power grid experienced a record high electricity load of 29.74 million kilowatts due to high temperatures [1] Group 1: Electricity Supply and Demand Management - The State Grid Chongqing Electric Power Company is actively managing the peak summer load by ensuring a reliable electricity supply and optimizing resource allocation [3] - The company has secured a maximum external electricity purchase capacity of 9.71 million kilowatts, which represents a 78% increase compared to the same period last year [3] - The company is closely monitoring weather changes and electricity demand to conduct precise load forecasting and maintain power balance across the grid [3] Group 2: Infrastructure and Emergency Preparedness - During the peak summer period, the company has restored 26 substations with personnel on duty, averaging over 1,031 personnel and 618 vehicles deployed daily [4] - The company has conducted 694 special inspections and 680 infrared temperature measurements to identify and eliminate equipment defects [4] - Emergency preparedness has been enhanced through meticulous team arrangements and material preparations to ensure the safe operation of the power grid and reliable electricity supply during the summer [4]