Workflow
累计打捞浒苔2.8万吨!青岛海上浒苔综合治理项目收官
Qi Lu Wan Bao Wang·2025-08-05 01:33

Core Insights - The Qingdao Marine Sargassum Comprehensive Management Project, undertaken by China State Construction Engineering Corporation (CSCEC) No.8 Bureau, has successfully completed its objectives, demonstrating a new paradigm of "technology-driven" management for ecological protection and sustainable urban development in the Yellow Sea region [1][7]. Group 1 - The project has collected a total of 28,000 tons of Sargassum, with a maximum daily processing capacity exceeding 1,700 tons, achieving a 30% increase in harvesting efficiency [1][5]. - A technological governance chain has been established in collaboration with the National Marine Satellite Application Center, moving beyond traditional "interception + harvesting + disposal" methods [3][5]. - The project employs a comprehensive monitoring system that includes high-resolution satellite remote sensing, IoT smart buoys, and drones, creating a closed-loop process of "monitoring - early warning - dispatch" [3][5]. Group 2 - The project has set multiple records in Sargassum management, including the installation of a 44-kilometer interception net in Laoshan District, with a total unloading volume of 51,000 tons and a 30% increase in daily processing compared to traditional methods [5][7]. - A "daily three-check" system is implemented to ensure the quality of operations, focusing on harvesting cleanliness, equipment status, and protective measures, alongside a safety control system [5][7]. - The innovative "sealed transport + resource utilization" model ensures that Sargassum removal is efficient and environmentally friendly, preventing secondary pollution and achieving compliance with water quality standards in the operational sea area [7].