Core Viewpoint - The article highlights the record-breaking electricity demand in Chongqing due to prolonged high temperatures, with the power grid load reaching 30.28 million kilowatts, marking the fourth historical high this summer and the first time surpassing 30 million kilowatts [1] Group 1: Electricity Demand and Supply - The electricity demand in Chongqing has been continuously rising due to sustained high temperatures, leading to a power grid load of 30.28 million kilowatts [1] - The Chongqing power grid has experienced its fourth historical high this summer, indicating a significant increase in electricity consumption [1] - The power grid load has now exceeded 30 million kilowatts for the first time, showcasing the growing energy needs of the region [1] Group 2: Response Measures - In response to the peak summer electricity demand, the State Grid Chongqing Electric Power Company is closely monitoring weather changes and assessing the power supply and demand situation [1] - The company has utilized external power purchase channels, importing nearly 10 million kilowatts of electricity from regions such as Sichuan, Xinjiang, and Hubei, which accounts for about one-third of the city's electricity load [1] - The company is also maximizing internal supply potential by strengthening energy security and enhancing the operation and maintenance of power supply facilities [1]
重庆高温天气持续 电网负荷首次突破3000万千瓦
Zhong Guo Xin Wen Wang·2025-08-05 15:32