中建八局一公司集成电路项目提前完成改造任务
Qi Lu Wan Bao·2025-08-07 23:50

Group 1 - The Xiamen Integrated Circuit Advanced Packaging and Testing Industrialization Base (Phase I) expansion project, undertaken by China State Construction Engineering Corporation (CSCEC) No. 8 Bureau, has completed all renovation tasks and achieved a cleanliness level of Class 100 [1][3] - The project team faced challenges such as a tight schedule, high standards, and an effective construction period of less than 100 days, implementing a "zoned and phased, cross-construction" strategy, and utilizing 80 lift vehicles for simultaneous operations to complete the renovation in 80 days [3] - To meet the cleanliness requirements of the project workshop, the team installed sealing strips and conducted leak tests, establishing 367 cleanliness testing points to ensure over 95% of the points achieved Class 100 cleanliness, exceeding the industry standard of Class 1000 [3] Group 2 - The project is located in Haicang District, Xiamen, and includes renovations for cleanliness, electrical systems, fire protection, and HVAC, serving as a significant expansion carrier for a leading microelectronics enterprise in Xiamen [3] - Upon completion, the project will significantly enhance the advanced packaging and testing capacity, promoting the self-controllability of the integrated circuit industry chain and supporting the development of the semiconductor industry cluster in Xiamen [3]

中建八局一公司集成电路项目提前完成改造任务 - Reportify