Core Viewpoint - The completion of the last unit of the Bala Hydropower Station marks a significant milestone in China's efforts to enhance energy supply and optimize regional energy structure, contributing to the national goal of clean energy development [1] Group 1: Project Overview - The Bala Hydropower Station, located in the Ma'erkang City of Sichuan Province, has a total installed capacity of 746,000 kilowatts and is designed to generate an average annual electricity output of 2.553 billion kilowatt-hours [1] - The station can meet the annual basic electricity needs of approximately 1 million households, equivalent to saving 1.16 million tons of standard coal and reducing carbon dioxide emissions by about 3 million tons [1] Group 2: Operational Significance - The Bala Hydropower Station is a key project under the State Grid's 2025 summer peak power supply plan, consisting of 140 critical power supply projects [1] - With all four units operating at a 100% load factor, the station significantly enhances the reliability of the regional power grid and its capacity to meet summer peak demands [1]
大渡河上游巴拉水电站实现全容量投产发电
Xin Hua She·2025-08-08 09:08