Core Viewpoint - The article highlights the significance of the Huaneng Turpan 1 million kW wind power project in Xinjiang, China, as a key player in achieving the country's carbon neutrality goals, while also addressing the unique challenges posed by extreme weather conditions in the region [1][11]. Group 1: Project Overview - The Huaneng Turpan project is the first million kW land-based high-wind resistance wind power project in China, located in a region known for extreme wind conditions, with recorded wind speeds reaching up to 49.1 m/s [3][5]. - The project consists of 14 EN-171/7.0 wind turbines designed for high turbulence mountain areas and 25 EN-182/7.0 turbines for low turbulence flatlands, all of which successfully achieved full capacity grid connection by May 25, 2025 [3][6]. Group 2: Technological Innovations - Envision Energy has developed innovative technology solutions tailored to the unique wind resource conditions, enhancing blade design and mechanical transmission to withstand extreme wind loads, with a maximum wind speed capability of 57 m/s [6][8]. - The project includes a backup power supply system to ensure operational reliability during critical moments, demonstrating a proactive approach to managing extreme weather challenges [6][9]. Group 3: Operational Strategies - Effective operational strategies have been implemented, including advanced weather forecasting, intelligent control systems, and automated inspections using drones to enhance maintenance efficiency and safety [9][11]. - The project has established a robust spare parts inventory and conducted training to improve on-site personnel's troubleshooting and repair capabilities, ensuring stable operations [9][11]. Group 4: Environmental Impact - Upon full operation, the project is expected to generate an annual electricity output of 22 billion kWh, equivalent to saving 710,000 tons of standard coal and reducing carbon dioxide emissions by 1.91 million tons [11].
超高极限风性能大考,谁能交出高分答卷?
Zhong Guo Neng Yuan Wang·2025-08-08 11:34