兰州11个区县暂停分布式光伏接入
Zhong Guo Hua Gong Bao·2025-08-12 02:13

Core Viewpoint - The Gansu Lanzhou Development and Reform Commission has announced the assessment results for distributed photovoltaic (PV) capacity in Lanzhou, indicating that 11 districts will have their distributed PV access suspended due to capacity constraints [1] Group 1: Policy Measures - The document prioritizes the development of distributed PV projects in green zones, while yellow zones require special analysis to ensure consumption conditions are met before development [1] - In red zones, distributed PV access will be suspended until the grid capacity is effectively improved [1] Group 2: Encouragement of Local Consumption - The policy encourages household PV systems to operate on a "self-consumption and surplus electricity online" basis, and commercial PV systems to utilize all generated power for self-consumption, thereby reducing pressure on the public grid [1] Group 3: Capacity Improvement Measures - The document promotes measures such as energy storage configuration and connecting to voltage levels of 10 kV and above to enhance the access capacity for distributed PV [1]