Core Insights - The successful grid connection of the 150,000 kW "Photovoltaic+" project by Datang Jilin Shengyuan marks the completion of another large-scale wind-solar-storage integrated project in China [1][3] Group 1: Project Overview - The integrated project is located in the Xiangyang and Erlong townships of Taonan City, Jilin Province, with a total capacity of 1,150,000 kW, including a wind power capacity of 1,000,000 kW from 439 wind turbines that began operation at the end of 2021 [3] - The newly connected photovoltaic project has a capacity of 150,000 kW, consisting of 6,532 monocrystalline silicon solar panels, optimizing energy spatial layout and enabling coordinated development of wind and solar energy [3] Group 2: Environmental Impact - The project is expected to generate an average annual electricity output of approximately 3.6 billion kWh, saving 1.18 million tons of standard coal, and reducing carbon dioxide emissions by 2.92 million tons, sulfur dioxide emissions by 30,000 tons, and nitrogen oxide emissions by 26,500 tons [3] - The project includes a supporting capacity of 7.5 MW/7.5 MWh lithium iron phosphate battery storage system, which consists of three 2.5 MW/2.5 MWh subsystems, addressing the randomness and intermittency of renewable energy generation [3] Group 3: Future Significance - The project will serve as a key power source for Jilin Province's "Land-based Wind-Solar Three Gorges" initiative, supporting the construction of a new energy industrial base in the western region of the province [4] - It aims to provide substantial clean electricity to downstream industrial enterprises, alleviating environmental protection pressures in the local power industry and improving the energy supply-demand structure [4] - The project is significant for promoting the high-quality integration of national energy transition and local revitalization, accelerating the development of a green and low-carbon economy [4]
我国又一大型风光储一体化项目建成投产发电