Core Insights - Shanghai's power grid reached a record high load of 40.55 million kilowatts on August 11, 2023, marking a 0.6% increase from last year's peak load of 40.302 million kilowatts [1] Group 1: Weather and Load Conditions - Shanghai is currently experiencing a subtropical high pressure and rain belt, leading to high temperatures and humidity, which contribute to the rising power load [1] - A yellow heat warning was issued at 9:28 AM, upgraded to an orange warning by 12:23 PM due to rapidly increasing temperatures [1] Group 2: Operational Measures - State Grid Shanghai Electric Power Company is implementing various strategies to manage the high summer load, including enhancing power receiving capacity, ensuring local peak generation, and promoting demand response [4] - The company has fully deployed 55 key projects for summer peak load management, achieving a maximum local generation capacity of 23.6 million kilowatts and a total receiving capacity of 24 million kilowatts [6] Group 3: Demand Response and Resource Management - The company has connected with 46 operators for virtual power plant capacity, with a declared capacity of 1.71 million kilowatts and adjustable capacity of 1 million kilowatts [6] - Demand response measures can reduce load by up to 2.1 million kilowatts, significantly enhancing grid flexibility [6] Group 4: Inter-Provincial Cooperation - Shanghai has established green electricity cooperation with 15 provinces, with inter-provincial green electricity transactions reaching 7.21 billion kilowatt-hours, showing rapid growth over the years [7] Group 5: Emergency Response and Customer Service - The company has set up a 24-hour grid service mechanism across 11 supply companies, with 61 service centers and 306 repair teams ready for rapid response [10] - Over 2,800 personnel and 890 repair vehicles are on standby to ensure efficient repair operations during high temperatures [10]
国网上海电力:4055万千瓦!上海用电负荷创历史新高