Core Insights - Manganese X Energy Corp. announced highly positive Phase 2 ore-sorting results, achieving an 80% increase in mill feed grade in its Battery Hill pilot program [2][5][7] - The ore-sorting process is expected to significantly reduce capital and operating costs, enhancing project economics [5][8] Group 1: Ore-Sorting Results - The pilot scale results indicate that the Battery Hill material is very amenable to ore sorting, with an 80% increase in manganese content per tonne after processing [2][3] - The ore-sorting program was conducted at RADOS Technologies lab in South Africa, processing over 400 kg of rock from the Battery Hill manganese deposit [4][6] - The study is part of the preparation for the upcoming Pre-Feasibility Study (PFS) scheduled to commence in Q3 2025 [6][10] Group 2: Economic Implications - The ore-sorting process is projected to deliver significant savings in capital expenditure (CAPEX) and operating costs (OPEX), which could positively impact the project's net present value (NPV) and internal rate of return (IRR) [5][8] - Higher-grade feed allows for a smaller facility to produce more metal, maximizing resource utilization and reducing environmental impact [8][10] - The results confirm the economic potential of the ore-sorting technology, supporting its integration into the company's operations [7][8]
RETRANSMISSION: Manganese X Reports Positive Phase 2 Ore-Sorting Results - Achieving 80% Mill Feed Upgrade Improvement - Projected to Reduce Capital and Operating Costs
Newsfileยท2025-08-12 11:38