Workflow
Integral Metals Provides Update on 2025 Drilling at the KAP Project
Globenewswireยท2025-08-12 12:00

Core Insights - Integral Metals Corp. has initiated its 2025 diamond drilling program at the KAP Project in the Northwest Territories, with the first hole completed to a depth of 86 meters and the second hole currently in progress [1][5] Group 1: Drilling Program Details - The company plans to conduct a staged program consisting of approximately six diamond drill holes aimed at testing high-priority extensions of historically drilled high-grade lead-zinc zones around the Main Showing area [2] - The first pad location has been selected to assess the central portion of the Main Showing, providing early insights into mineralization and geometry [3] - The second pad is designed to evaluate mineralization along and north of historical hole F-96-05, aiming to extend the strike and investigate discrepancies between historical drilling results [4] Group 2: Company Strategy and Goals - The drilling sequence is designed to be flexible, with early results guiding subsequent targeting, which may lead to an expansion of known zones at the Main Showing [5] - Integral Metals Corp. is focused on mineral exploration for critical minerals, including gallium and germanium, contributing to the development of a domestic supply chain for these minerals [8]