Group 1 - The Jin Jian High-speed Railway has officially entered the long rail storage phase with the arrival of a 500-meter long rail transport train at the Lankxi East Station [1] - The railway segment from Lankxi East to Jiande Station has a total length of 43.5 km, with 87.1 km of main line track laid, 6.63 km of station line track, and 30 sets of turnouts [1] - The Jin Jian Railway, which connects Jinhua and Jiande, is a crucial transportation link with a total length of 64.51 km and a design speed of 250 km/h [1] Group 2 - Upon completion and operation, the Jin Jian High-speed Railway will connect multiple economic circles, including the Huangshan Tourism Economic Circle and the Central Zhejiang Urban Agglomeration [2] - The railway will significantly enhance travel efficiency for residents in the western part of Hangzhou, allowing direct access to Lankxi without the need to detour to Hangzhou East Station [2] - The travel time will be greatly reduced compared to the current 2-hour self-driving or the need for transfers on conventional trains [2]
500米“钢铁长龙”就位 金建高铁建设加速
Mei Ri Shang Bao·2025-08-12 22:25