Workflow
深圳机场三跑道扩建工程通过竣工验收

Group 1 - Shenzhen Airport's third runway expansion project has successfully passed the completion acceptance, laying a solid foundation for subsequent test flights and industry acceptance, with formal operation expected within the year [1] - The project includes the construction of a new third runway, parallel taxiways, and supporting facilities such as navigation lights, power supply, water supply, and fire rescue systems, with comprehensive inspections conducted by five specialized acceptance groups [1][2] - Shenzhen Airport aims to enhance project standards and ensure smooth completion of follow-up works to meet industry acceptance requirements [2] Group 2 - Shenzhen Airport is a key national project and a major engineering initiative in Guangdong Province, designed to accommodate large passenger aircraft with a runway length of 3,600 meters and a width of 45 meters [2] - By the end of 2024, Shenzhen Airport is expected to have a peak hour capacity of 65 aircraft movements, ranking first among domestic dual-runway airports, with 186 passenger destinations and a total passenger throughput of 61.48 million, second in the country for domestic passenger volume [2] - The airport has reported steady growth in performance, with a projected net profit for the first half of 2025 expected to be between 287 million and 337 million yuan, representing a year-on-year increase of 64.78% to 93.47% [3] - In the first half of the year, international and regional passenger traffic at Shenzhen Airport exceeded 3 million for the first time, with flight numbers surpassing 20,000, both figures exceeding those of the same period in 2019 [3]