Core Viewpoint - The successful completion of the 168-hour full-load trial operation of the Hami 2×1000 MW Unit 2 marks a significant milestone for the "Xinjiang Power Transmission to Chongqing" project, ensuring reliable power supply and integration of renewable energy in the region [1][2] Group 1 - The Hami 2×1000 MW Unit 2 has achieved stable operation with all key parameters meeting design specifications, indicating readiness for commercial operation [1] - The project is part of the first batch of "Shage Desert" energy base supporting thermal power projects, utilizing domestically produced high-efficiency ultra-supercritical indirect air-cooled units [1] - The successful operation of this power plant will support the safe operation of the ±800 kV UHVDC transmission system and facilitate the reliable integration of renewable energy from Xinjiang [1] Group 2 - The commissioning team from Shandong Zhongshi Yitong Group has demonstrated strong technical capabilities, contributing to the successful operation of the project [2] - The team is committed to continuing their technical support to enhance the construction of the power grid [2]
华电新疆哈密2×1000兆瓦煤电项目2号机组正式移交生产
Qi Lu Wan Bao·2025-08-14 01:44