Workflow
我省6年内要建77条(段)幸福河湖
Liao Ning Ri Bao·2025-08-14 01:54

Core Points - The implementation plan for the construction of "Happy Rivers and Lakes" in Liaoning Province aims to establish 77 segments over six years, covering a total river length of 4,700 kilometers and a watershed area of 47,700 square kilometers [1] - By the end of 2024, Liaoning Province has already completed the creation of 94 provincial-level "Happy Rivers and Lakes" [1] Group 1 - The selection of the 77 segments is based on the results of a provincial water resources survey, focusing on rivers with a watershed area of at least 50 square kilometers and lakes with a surface area of 1 square kilometer or more [1] - Each selected river and lake has a health evaluation report indicating a "healthy" status or above, and there are no significant constraints such as regional conflicts or illegal constructions [1] Group 2 - Common issues identified in the province's rivers and lakes include inadequate flood control capabilities, significant shoreline degradation, and a lack of accessible facilities along riverbanks [1] - The construction of "Happy Rivers and Lakes" aims to address these issues, focusing on improving water resources, ecology, environment, and cultural aspects [1] Group 3 - The rivers in Liaoning Province exhibit different characteristics based on their geographical regions, necessitating targeted construction efforts for "Happy Rivers and Lakes" [2] - The proposed 77 segments are distributed across 14 cities, with the Liao River system having the highest representation at 21 segments [2] - Key objectives include ensuring water safety, enhancing ecological conditions, and improving water quality, with specific targets such as achieving an 80% compliance rate for water quality at major monitoring points [2]