Workflow
Nova Pacific Reports Strong Intercepts Including 2.5 g/t AuEq Over 10 m, 4.0 g/t AuEq Over 6.05 m, and 1.7 g/t AuEq Over 12 m at Lara VMS Project on Vancouver Island, B.C.
Nova .Nova .(US:NVMI) Newsfileยท2025-08-14 12:30

Core Viewpoint - Nova Pacific Metals Corp. has reported strong assay results from its Phase 1 exploration drilling campaign at the Lara VMS Project, indicating potential for significant mineralization and supporting the historical drilling data [1][3][6]. Summary by Sections Exploration Results - The company completed 41 drill holes totaling 8,660 meters, with results from 23 holes reported and assays pending from 16 holes [6][19]. - Notable intercepts include: - NP25-029: 10 m grading 2.5 g/t AuEq from 100 m downhole [5]. - NP25-027: 6.05 m grading 4.0 g/t AuEq from 45.45 m downhole [5]. - NP25-022: 12 m grading 1.7 g/t AuEq from 166 m downhole [5]. - The results validate the company's exploration model and provide geological insights for further mineralization opportunities [7][19]. Future Plans - The company anticipates strong news flow as it progresses towards a mineral resource estimate targeted for Q4 2025 [3][19]. - Assays from 16 additional drill holes are pending, including step-out holes designed to test extensions beyond known mineralization [4][16]. Geological Context - The Lara Project is located within a 17-km belt of the McLaughlin Ridge Formation, which is associated with the past-producing Myra Falls VMS Mine [1][20]. - The exploration program aims to verify historical drilling data across 39,092 m of drilling to support a current mineral resource estimate [19][20]. Community Engagement - The company is committed to early and meaningful engagement with Indigenous communities, recognizing their rights and aiming for mutually beneficial partnerships [26][27]. Company Overview - Nova Pacific Metals Corp. is focused on advancing the Lara VMS Project, which hosts a significant historical mineral resource enriched with critical and precious metals [28].