Core Points - The last tunnel of the Yukun High-speed Railway's Sichuan-Yunnan section, the Junlian Tunnel, successfully broke through on August 15, marking the completion of all 28 tunnels in this section [1] - Once completed, the Yukun High-speed Railway will enable travel from Chengdu to Kunming in approximately 3 hours [1] Group 1 - The Junlian Tunnel is located between Yibin County in Sichuan and Yanjin County in Yunnan, featuring complex geological conditions and is a key project for the Yukun High-speed Railway [1] - The tunnel measures 7,888 meters in length with a maximum depth of 635 meters, and 84% of the surrounding rock is classified as level four and five, indicating significant construction challenges [1] - Advanced technologies such as geological radar scanning and advanced horizontal drilling were utilized to predict risks associated with karst water and gas distribution, leading to substantial cost savings in construction [1] Group 2 - The maximum monthly excavation rate for the Junlian Tunnel reached 140 meters, and the tunnel was completed ahead of schedule with a focus on safety [1] - Currently, the roadbed engineering for the Sichuan-Yunnan section is 99% complete, while bridge engineering is 92% complete, with electrical and station construction progressing rapidly [1]
“成都3小时到昆明”新进展 ——渝昆高铁川滇段全线隧道贯通
Si Chuan Ri Bao·2025-08-17 00:45