Core Insights - The Chongqing Sanfeng Yulin Environmental Power Plant has transformed the perception of waste incineration facilities, showcasing a clean and intelligent approach to waste management [1][2] - The plant has achieved a 100% harmless disposal rate for municipal waste in Chongqing's central urban area since its commercial operation began in 2021 [1] - The facility processes waste through a highly automated system, minimizing human intervention and ensuring compliance with stringent environmental standards [1] Summary by Sections Facility Overview - The plant is responsible for waste disposal in Yubei, Jiangbei, and Liangjiang New Area, with operations starting from 2018 and commercial use from 2021 [1] - It features a cloud café at 79 meters high, providing a stark contrast to traditional perceptions of waste treatment facilities [1] Waste Processing Technology - Waste is transported in sealed trucks, weighed, unloaded, and processed through fermentation before being incinerated in a controlled manner [1] - The incineration process generates steam to drive turbines for electricity generation, with the plant capable of supplying 1.7 million kilowatt-hours of electricity daily, enough for 150,000 households [1] Environmental Impact - The facility employs advanced technology to control combustion temperatures and gas retention times, significantly reducing dioxin emissions [1] - Emissions from the plant are treated through multiple purification steps, ensuring they are well below EU standards [1][2]
垃圾处理厂喝咖啡是什么体验丨活力中国调研行
Jing Ji Ri Bao·2025-08-17 07:21