Workflow
防汛正当时,守护电力“生命线”
Zhong Guo Neng Yuan Wang·2025-08-18 03:48

Core Viewpoint - The company is actively implementing flood prevention measures to ensure the safety and stability of the power grid during the rainy season, emphasizing the importance of public safety and reliable electricity supply [1] Group 1: Flood Prevention Measures - The company conducted special inspections at the 35 kV Shizhuang Substation to check flood prevention facilities, ensuring no water accumulation and normal operation of drainage pumps [1] - The company has revised flood emergency plans based on the principle of "one station, one plan, one line, one strategy," and has equipped over 10 emergency devices including generators and pumps [1] - A 24-hour duty system has been established, and emergency drills have been conducted to enhance emergency response capabilities [1] Group 2: Monitoring and Maintenance - Regular inspections of cable trenches, cable wells, and drainage ditches are being carried out to check for water accumulation and to clear any obstructions [1] - The company has utilized drone inspections to monitor vulnerable sections of power distribution lines, successfully clearing over 400 tree obstructions and 26 bird nests [1] - Measures have been implemented to protect distribution boxes and ring network cabinets from rainwater intrusion, preventing potential faults [1] Group 3: Future Actions - The company will continue to monitor weather changes and strengthen 24-hour monitoring and early warning systems to ensure effective flood prevention measures are in place [1] - The focus remains on guaranteeing the safe and stable operation of the power grid and reliable electricity supply for the public [1]