Core Viewpoint - The project marks the first large-scale photovoltaic energy storage system in the Beijing-Tianjin-Hebei region, indicating a significant breakthrough for Jichai Power in both regional and niche markets [1][2] Group 1: Project Details - The energy storage system consists of 7 sets of 5 MW/10 MWh storage products, including 14 non-walk-in liquid-cooled battery cabins and 7 integrated inverter-boosting units [1] - The total design capacity of the energy storage system is 35 MW/70 MWh, with a storage duration of 2 hours, aimed at peak shaving, smoothing output curves, and addressing photovoltaic curtailment [1][2] Group 2: Technical Features - The project utilizes lithium iron phosphate liquid cooling storage systems, which are waterproof, fireproof, wind-resistant, and highly corrosion-resistant, offering high safety, long lifespan, and high integration [2] - The entire engineering structure is designed in a containerized format, ensuring high efficiency, rapid deployment, and good economic viability, with expectations for same-year construction and commissioning [2] Group 3: Impact and Significance - Upon operation, the energy storage system is projected to generate an average annual output of 360 million kWh, equivalent to the annual electricity consumption of 140,000 households [2] - The project is expected to significantly contribute to the upgrade of the regional energy structure, promote industrial integration, and improve the ecological environment [2]
济柴动力储能业务落地京津冀地区和水面光伏储能市场
Zhong Guo Jin Rong Xin Xi Wang·2025-08-18 07:25