Workflow
水利部召开“七下八上”防汛关键期水旱灾害防御工作情况新闻通气会
Shui Li Bu Wang Zhan·2025-08-18 10:54

Core Viewpoint - The Ministry of Water Resources of China has implemented comprehensive flood and drought disaster prevention measures during the critical flood season from July 16 to August 15, addressing severe weather events and minimizing damage from floods and droughts [1][2]. Group 1: Flood and Drought Disaster Prevention Measures - During the critical flood period, 330 rivers experienced floods exceeding warning levels, with 77 rivers surpassing safety levels and 22 rivers recording the highest floods since measurement began [1]. - The Ministry has established a work mechanism to ensure no casualties, no dam failures, and the safety of urban and rural water supply, irrigation needs, and livestock water requirements [1][2]. - A total of 146.5 billion cubic meters of floodwater was stored through the operation of 1,388 large and medium-sized reservoirs across seven major river basins, demonstrating significant flood reduction benefits [2]. Group 2: Emergency Response and Coordination - The Ministry conducted 8 meetings led by the Minister to discuss flood defense and emergency rescue operations, enhancing monitoring and early warning systems [2]. - A total of 543 flood warnings were issued, and 37 working and expert groups were dispatched to guide frontline operations [2]. - Local governments successfully organized the evacuation of 771,700 people from dangerous areas in response to flood warnings [2]. Group 3: Ongoing Challenges and Future Actions - The Ministry emphasizes the need to maintain vigilance during the main flood season, reinforcing political responsibility and implementing detailed defense measures [3]. - Continuous efforts will be made to ensure the safety of people's lives and property, as well as the stability of society [3].