Core Insights - The Puguang gas field has achieved a cumulative production of over 130 billion cubic meters of gas, contributing significantly to national energy security [1] - The gas field is a major supply source for the "West-to-East Gas Transmission" project and is recognized as the first successfully developed large-scale marine high-sulfur gas field in China [1] - Challenges such as water intrusion, sulfur deposition, and declining formation pressure are impacting production and development, making it increasingly difficult to maintain stable output [1] Company Developments - China Petroleum & Chemical Corporation (Sinopec) has developed leading water control and sulfur treatment technologies to address production challenges [1] - The company is implementing measures such as pressure boosting and initiating a new round of capacity construction to stabilize production levels [1] - More than 20 land-based gas wells have been put into production, with a cumulative gas output exceeding 200 million cubic meters [1]
普光气田累计产气突破1300亿立方米
Si Chuan Ri Bao·2025-08-19 21:25