Workflow
新武金堤路全线贯通
Chang Jiang Ri Bao·2025-08-20 00:42

Core Points - The new Wujin Dike Road has officially opened, providing a vital north-south artery through the southern part of Wuchang, enhancing regional traffic connectivity [1][2] - The road spans 3.14 kilometers with a dual six-lane design, allowing for a speed limit of 60 km/h, and connects multiple east-west thoroughfares, benefiting over 60,000 households in the Baisha Zhou area [2] - The construction utilized continuous reinforced concrete structure specifically designed for heavy-load vehicles, improving logistics for nearby markets [2] Traffic Impact - The opening of the new road significantly reduces travel time, with residents reporting a decrease from over 30 minutes to just 15 minutes for certain routes [2] - The new road is expected to alleviate traffic pressure on the old Wujin Dike Road by creating a circular road network, thus enhancing traffic flow in the area [2] Economic Development - The project is anticipated to inject new momentum into the economic development of the Wuchang Riverside Business District and Baisha Zhou area by optimizing the transportation network and improving infrastructure [2]