Workflow
广州轨道交通迎来通车“大年”
Nan Fang Du Shi Bao·2025-08-20 06:39

Group 1: Metro and Intercity Rail Developments - Guangzhou Metro has opened the 10th line (Yangji East to Xilang section) and the 12th line (Xunfenggang to Guangzhou Sports Center, and Ersha Island to South University Town) on June 29, enhancing connectivity with multiple lines including the Guangfo Line and Line 22 [1] - The Guangzhou Metro plans to open a total of 10 lines (sections) this year, covering a total length of 173 kilometers, which includes 6 metro lines and 4 intercity lines, forming a three-dimensional transportation network of "metro + intercity" [1] - Three intercity railways have passed preliminary acceptance, including the Guangfo East Ring, the Pazhou Branch of the Suiguan-Shenzhen Intercity Railway, and the New Baiyun-Guangzhou Airport T2 section, marking significant progress towards operational readiness [3] Group 2: High-Speed Rail Progress - The construction of the Guangzhan High-Speed Railway has completed the full track laying, with a total length of approximately 401 kilometers and over 897 kilometers of track laid, aiming for completion by the end of the year [2] - Guangzhan High-Speed Railway is a key component of the national high-speed rail network and is expected to significantly reduce travel time between the western Guangdong region and the Guangdong-Hong Kong-Macao Greater Bay Area [2] Group 3: Baiyun Airport Developments - Baiyun Airport has served over 50.2 million passengers from January 1 to August 13, 2025, marking an 8.3% increase compared to the same period last year [4] - The T3 terminal of Baiyun Airport is set to be operational this year, contributing to a large hub structure of "three terminals + five runways" [6] - Baiyun Airport is positioned as a crucial air bridge connecting the Greater Bay Area to the world, with over 240 domestic and international destinations and more than 1,700 international flights weekly [5]