Workflow
1.55亿千瓦!今夏用电负荷第四次突破极值

Group 1 - Jiangsu power grid reached a record high electricity load of 155 million kilowatts, a year-on-year increase of 5.99% compared to last year's peak [1] - The increase in electricity load is driven by high temperatures, air conditioning demand, and the steady improvement of Jiangsu's economy, including data centers and electric vehicle charging needs [1] - Jiangsu's coal power output reached a maximum of 78.71 million kilowatts this summer, a year-on-year increase of 7.14%, contributing 45% during peak hours [1] Group 2 - Jiangsu New Energy (603693) has an installed capacity of 110 million kilowatts, playing a crucial role in power supply this summer [2] - Wind and solar power in Jiangsu reached a cumulative maximum output of 55.47 million kilowatts, accounting for 40% of the total generation output [2] - The implementation of the first "AC to DC" transmission project in Jiangsu has significantly enhanced the interconnection capabilities of the power grid along the Yangtze River [2]