Workflow
今夏江苏最高用电负荷第四次突破极值
Xin Hua Ri Bao·2025-08-20 23:13

Group 1 - The highest electricity load in Jiangsu reached 155 million kilowatts, marking a 5.99% increase compared to last year's peak [1] - The increase in electricity demand is driven by high temperatures, with air conditioning being the main contributor, alongside the growing needs from data centers, electric vehicle charging, and nighttime economy [1] - Jiangsu's coal power output reached a maximum of 78.71 million kilowatts, a 7.14% year-on-year increase, contributing 45% during peak hours [1] Group 2 - Jiangsu's installed capacity of renewable energy has reached 110 million kilowatts, playing a crucial role in power supply this summer [2] - Wind and solar power combined reached a maximum output of 55.47 million kilowatts, accounting for 40% of the total generation output [2] - The implementation of the first "AC to DC" transmission project in Jiangsu has significantly enhanced the interconnection capabilities of the power grid across the Yangtze River, facilitating the transfer of renewable energy [2]